Close Menu
    Sultanate TimesSultanate Times
    • Automotive
    • Business
    • Entertainment
    • Health
    • Lifestyle
    • Luxury
    • News
    • Sports
    • Technology
    • Travel
    Sultanate TimesSultanate Times
    Home » Arctech Scores New Spring Win – Awarded 500MW Manah I PV Plant in Oman
    PR Newswire

    Arctech Scores New Spring Win – Awarded 500MW Manah I PV Plant in Oman

    March 29, 2024
    Facebook WhatsApp Twitter Pinterest LinkedIn Telegram Tumblr Email Reddit VKontakte

    KUNSHAN, China, March 29, 2024 /PRNewswire/ — Arctech has recently signed a contract for the 500MW Manah I power plant project in Oman, following its successful bid for the 588MW Manah II PV project in Oman earlier in 2023. This consecutive project win showcases Arctech’s customized solutions tailored for the Middle East’s desert regions as well as its strong global competitiveness.

    500MW Manah I PV Project Signing Ceremony at Arctech Headquarters

    With Oman’s rapid growth in power demand in recent years, the government plans to achieve 20% renewable energy consumption by 2030 and raise it to 35%-39% by 2040. The Manah I and II projects are key to accelerating Oman’s energy transition and an important practice for Arctech in pursuing Belt and Road cooperation.

    The Manah I project, with 640MW capacity, is located in Oman’s Ad Dakhiliyah Governorate. Affected by the tropical desert climate, the area is frequently impacted by extreme weather like heavy rain, strong winds, and sandstorms. The complex terrain with depressions also presents a need for high requirements on tracker stability and terrain adaptability.

    The project adopted Arctech’s flagship 1P SkyLine II tracker. With its multi-point drive mechanism and patented triple D torque tube, SkyLine II greatly enhances system stability under desert wind loads. The tracker’s wind stow speed reaches 22m/s. Meanwhile, the highly stable torque tube allows a post span of up to 10m, reducing post quantities by around 20% and lowering civil work costs.

    To enhance system adaptability and power generation efficiency, Arctech provided customer-centric customized solution designs optimized for the Manah I project’s needs.

    For the undulating terrain with depressions, four different module heights were customized to better adapt to the site’s topography. To boost energy yields, the tracker-bifacial module combination creates a synergistic 1+1>2 effect. Additionally, the purlins underwent bearing capacity optimization for better cleaning robot compatibility, minimizing soiling losses and boosting generation performance.

    Photo – https://mma.prnewswire.com/media/2374279/500MW_Manah_I_PV_Project_Signing_Ceremony_Arctech_Headquarters.jpg

    Cision View original content:https://www.prnewswire.co.uk/news-releases/arctech-scores-new-spring-win—awarded-500mw-manah-i-pv-plant-in-oman-302103277.html


    Related Posts

    Can Doing Good Create Business Value?

    September 10, 2026

    Aircom Appoints Khurram Chaudhry as General Manager

    September 10, 2026

    RAMINVEST HOLDING Advances Mauritania Gold Exploration Following 50.14 g/t Gold Assays at Wompou Project

    September 10, 2026

    World’s First Robot Sports League Launched in Riyadh, Plans to Hit 8 Cities Worldwide

    September 9, 2026

    $1 Million Awarded to Social Impact Student Start-Up at 2026 EF Hult Prize

    September 9, 2026

    Adani Airports to raise ~USD 1 billion of primary equity from marquee global investors

    September 9, 2026
    Latest News

    UAE-Germany ties in focus during presidential visit

    September 10, 2026

    iPhone 18 Pro brings variable aperture and A20 Pro chip

    September 10, 2026

    Apple launches iPhone Duo foldable starting at $1,999

    September 10, 2026

    Gold steadies near $4,400 with US inflation in focus

    September 10, 2026

    Ballon d’Or 2026 shortlist sets stage for London awards

    September 9, 2026

    US battery growth still depends on Chinese materials

    September 9, 2026

    Panama Canal could cut daily ship limit to 29

    September 9, 2026

    Etihad sets October start for Abu Dhabi Saudi Red Sea route

    September 9, 2026
    © 2026 Sultanate Times | All Rights Reserved
    • Home
    • Contact Us

    Type above and press Enter to search. Press Esc to cancel.